- 2/19/21 - Glad to hear the Predator sales are
growing.I found your tool to be very
effective and efficient in most all of the
wells it was installed it. It improved the
pump fillage and sometimes it even
increased the production. It makes
the tool economically and operationally
justifiable.
Take care and hope sales continue
to increase.
C.H., Retired Production/Operations Eng.
- 12/2020 - We've just received new feedback from a couple of our wells. 2 3/8" tool, 2 sticks, in the vertical, landed at 6942' inside of 4.5" casing, total gas 820McfD and total fluid 384 BPD. 240" stroke, 2" pump at 4.1 SPM pump efficiency 84%, now that's incredible. GLR of 2135.0!
Pump Bore (in) - 2
Surface Stroke (in) - 240
SPM> | 4.1 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Pump Efficiency |
m3/Day Bbl/Day | 73.0 458.9 | 71.2 447.7 | 89.0 559.7 | 106.8 671.6 | 124.6 783.6 | 142.4 895.5 | 160.2 1007.4 | 178.0 1119.4 | 100% |
m3/Day Bbl/Day | 69.3 436.0 | 67.6 425.4 | 84.5 531.7 | 101.4 638.0 | 118.3 744.4 | 135.3 850.7 | 152.2 957.1 | 169.1 1063.4 | 95% |
m3/Day Bbl/Day | 65.7 413.0 | 64.1 403.0 | 80.1 503.7 | 96.1 604.5 | 112.1 705.2 | 128.1 805.9 | 144.2 906.7 | 160.2 1007.4 | 90% |
m3/Day Bbl/Day | 61.3 385.5 | 59.8 376.1 | 74.7 470.1 | 89.7 564.2 | 104.6 658.2 | 119.6 752.2 | 134.5 846.2 | 149.5 910.3 | 84% |
S.T
- On 5/22 I sent you a well report for a
well doing 500 MCFD, 280 BPD, &
90% PF.
Today, I have one for you from another
operator that is doing even better:
500+ MCFD, 350+ BPD, 98% PF &
24 hr. RT.
The MCFD on this well has spiked
to over 700 and BPD have exceeded
530 but both of those were just spikes
in production.M.K.
M.K.
- “The ‘X12345’ had a Predator Gas Separator installed in about 2 weeks ago during a routine tubing leak repair. The pump card shown below taken this morning shows that the pump fillage is between 90 to 95%! The Cavins gas separator was only providing 70% pump fillage on this well with 1000 psi of pump intake pressure and the production appears to have increased from about 23 BOPD to 42 BOPD and the gas is way up from 150 to 475 MCFPD. This may be a flumping or surging well that the Predator is handling very well. The fluid level has been pulled down from 2700’ to about 1900’ of fluid above the pump and the well has quit cycling as much, so the unit is able to pump more fluid every day. The Predator gas separator is working GREAT!
Sr. Prod. Eng. T.B.
- These (2) wells have the new 60’ Predator X-6 Separators. The ‘xx09’ was installed about 40 days ago and a Request has been made to speed up the SPM. “First time in our history“. The x02 has been in the hole for about 15 days and run time is climbing 2-4 points per day as fluid level comes down.
C.M.